For Contractors & Builders

Accurate quantities, fewer change orders, real-time progress

ApexBIM gives you the tools to win more bids with accurate quantity takeoffs, handle change orders without the chaos, and see exactly where construction stands — all from the same model the design team is using.

The Problem

Challenges contractors & builders face

These are the real problems you deal with every day. We built ApexBIM to solve them.

Takeoffs are slow and full of errors

Counting doors, measuring walls, and calculating areas from drawings is a manual process that takes days and is full of mistakes. One missed door type or wrong wall length can throw off your entire bid.

Change orders cause a chain reaction

When a design change comes in, figuring out how it affects the schedule, cost, and materials is a manual process. Change orders get tracked in email threads, and their knock-on effects are often missed until they cause delays.

No real-time view of progress

Construction progress is tracked in weekly reports put together from photos, site visits, and subcontractor updates. There's no live view of what's been installed versus what's planned — making it hard to spot delays early.

RFIs and submittals lost in email

Submittals, RFIs, and change orders live in email inboxes, spreadsheets, or separate tools. Nothing connects back to the 3D model, so resolving an RFI means hunting for the right drawing and hoping it's current.

The Solution

How ApexBIM helps

Each pain point has a direct solution in ApexBIM. Here's how the platform addresses your challenges.

Automatic quantity takeoffs
Quantity Takeoff

Get quantities straight from the building model — count elements by type, calculate wall and floor areas, and export to your estimating spreadsheet. Every number links back to the 3D element it came from, so you can verify with a click.

Change orders connected to the model
Change Orders

When a design change arrives, see exactly which parts of the model are affected. Track the change, link it to schedule tasks and cost items, and notify the right subcontractors — all in one place.

See your schedule come to life
4D Timeline

Link schedule tasks to building elements and watch your construction sequence play out in 3D. Filter by date to see what should be done at any point. Spot scheduling conflicts before they happen.

RFIs and submittals in one place
Project Management

Create RFIs and submittals linked to specific parts of the 3D model. Track status, assign to the right people, and resolve issues without losing context. Every RFI connects directly to what it's about.

The Impact

measurable results

Teams using ApexBIM report these improvements:

From 3 days to 2 hours
Takeoff time
80% faster
Change order impact check
70%
Delays caught early

Ready to see ApexBIM in action?

Join the contractors & builders using ApexBIM to streamline their workflow. Start your free trial today.